Milford Vaporizer Replacement Project (LNG)

Need: Southern Connecticut Gas sought a partner to assist with the design and replacement of their vaporization system. This required interaction with the Federal Energy Regulatory Commission (FERC) to complete the plant modifications.

Solution: ODIN was selected by SCG/Avangrid to perform the work which started in 2018 and is continuing in 2019. The project involves replacing the existing heaters with two Johnston Boiler heaters to increase throughput capabilities and enhance system reliability. ODIN is expected to complete the project before the 2019 heating season.

Milford Vaporizer Replacement Project (LNG)