Full EPC Provided For Avangrid/Southern Connecticut Gas
Avangrid/Southern Connecticut Gas’s Milford plant (TPS) sought to replace their boilers and vaporizers requiring Federal Energy Regulatory Commission (FERC) approval.
ODIN was selected as full EPC for replacement of the boilers and vaporizers and supported Avangrid to obtain FERC approval. The project would increase vaporization capacity to improve delivery capabilities to the pipeline system while a new compressor would move the boil-off natural gas from the tank to the pipeline system.
ODIN EPC was responsible for the full installation and commissioning of the new equipment.
LNG Peak Shaving Capacity
The Milford LNG facility located in Milford, CT safely and efficiently liquefies, stores and vaporizes natural gas for use during periods of peak demand. The capacity and rates provided are:
- Liquefaction rate 6 MMcf/d
- FERC rated sendout capacity of 105 MMcf/d
- Working gas capacity of 1,140 MMcf
Markets and Services Provided
LNG Peak Shaving
Boiler and Vaporizer Replacement
Engineering
Project Initiation
Maintenance Services
Performance Services
Procurement
Construction
Commissioning
ODIN is a Proud Member of These Industry Organizations
Contact Us
Main Office
2 Highwood Dr.
Suite 204
Tewksbury, MA 01876
New Jersey Office
28 Valley Rd.
Montclair, NJ 07042
PA Office
100 Front St.
Suite 900
West Conshohocken, PA 19428
AICPA–SOC 2 Type 2 Compliant
Tier 3 assessment for PSE&G
Silver Award, Enbridge