PSEG Meadowlands Upgrade
Upgrade Over Pressure Protection System
PSEG desired a consultant to design an upgrade to provide additional measures of over pressure protection at their Meadowlands regulation facility.
ODIN was engaged to provide engineering and design services to support this effort. ODIN’s solution included installing a downstream monitor in each of the redundant runs which would engage upon failure of the primary monitor regulator which is the primary means of overpressure protection. ODIN also designed a temporary regulated bypass which included a downstream worker with upstream monitor set up which provided a secondary means of over pressure protection since this station could not be taken out of service.
Back to Project PortfolioMarkets and Services Provided
Natural Gas
Regulation
Engineering
Design
ODIN is a Proud Member of These Industry Organizations
Contact Us
Main Office
2 Highwood Dr.
Suite 204
Tewksbury, MA 01876
New Jersey Office
28 Valley Rd.
Montclair, NJ 07042
PA Office
100 Front St.
Suite 900
West Conshohocken, PA 19428
AICPA–SOC 2 Type 2 Compliant
Tier 3 assessment for PSE&G
Silver Award, Enbridge