Eversource Derby Gate Controls Upgrade

Eversource Derby Gate Controls Upgrade

Eversource wanted to upgrade the natural gas transfer from Kinder Morgan Tennessee Gas Transmission to Eversource Yankee Distribution at the Derby Gate in CT. ODIN’s contribution was to install a new station remote terminal unit (RTU) and a dedicated heater system logic-based controller (PLC).

ODIN designed, procured, and installed the two control cabinets and integrated them into the overall station modernization upgrade. Throughout installation and commissioning, ODIN provided oversight, engineering, and construction management services.

Above and beyond the original scope, ODIN re-designed and installed the boiler emergency-shut-off system. ODIN’s turnover scope included complete station as-built drawings of the facility as well as integration of program files for the new control cabinets.

Back to Complete Projects | Back to Design Projects

Markets and Services Provided

Natural Gas

Engineering
Design
Controls
Construction
As-Built Design

Eversource Derby Gate Controls Upgrade
Eversource Derby Gate Controls Upgrade
PSEG Hillsborough Station M&R Upgrade

ODIN is a Proud Member of These Industry Organizations

ODIN EPC - Bold, Innovative, Experienced

Main Office
2 Highwood Dr.
Suite 204
Tewksbury, MA 01876

New Jersey Office
28 Valley Rd.
Montclair, NJ 07042

PA Office
100 Front St.
Suite 900
West Conshohocken, PA 19428

cvm data security AICPA–SOC 2 Type 2 Compliant

cyber grx certification Tier 3 assessment for PSE&G

Eco Vadis Sustainability Silver Award Silver Award, Enbridge

ODIN's energy design and EPC projects provide home heating for millions, power to our neighboring businesses, and support carbon reduction for our society.
This is default text for notification bar