Eversource Derby Gate Controls Upgrade
Eversource wanted to upgrade the natural gas transfer from Kinder Morgan Tennessee Gas Transmission to Eversource Yankee Distribution at the Derby Gate in CT. ODIN’s contribution was to install a new station remote terminal unit (RTU) and a dedicated heater system logic-based controller (PLC).
ODIN designed, procured, and installed the two control cabinets and integrated them into the overall station modernization upgrade. Throughout installation and commissioning, ODIN provided oversight, engineering, and construction management services.
Above and beyond the original scope, ODIN re-designed and installed the boiler emergency-shut-off system. ODIN’s turnover scope included complete station as-built drawings of the facility as well as integration of program files for the new control cabinets.
Back to Project PortfolioMarkets and Services Provided
Natural Gas
Engineering
Design
Controls
Construction
As-Built Design
ODIN is a Proud Member of These Industry Organizations
AICPA–SOC 2 Type 2 Compliant
Tier 3 assessment for PSE&G
Silver Award, Enbridge