PGW Passyunk LNG Facility Solar Power Study

PGW Passyunk LNG Facility Solar Power Study

Solar Power Feasibility Study

Philadelphia Gas Works (PGW) desired a consultant to determine the feasibility of installing a solar panel array at their Passyunk LNG facility as part of modernization of the facility.  The new array would utilize unused open space inside the facility and provide electricity to the plant as well as the local power grid for public use.

ODIN was engaged to perform a feasibility study to help determine the optimal placement of solar panels on the site and the resultant power output of those panels.  ODIN also conducted a load study of the plant to determine how much of the power could be allocated to the plant and the local grid.

ODIN’s services on this project included a feasibility study, preliminary panel layout(s), preliminary electrical one line, and assisting PGW in the initial steps in the application for the installation with the local power company.

Back to Complete Projects | Back to Design Projects

Markets and Services Provided

Liquified Natural Gas
Solar Power

Preliminary Engineering

PGW Passyunk LNG Facility Solar Power Study
PGW Passyunk LNG Facility Solar Power Study
PGW Passyunk LNG Facility Solar Power Study

ODIN is a Proud Member of These Industry Organizations

ODIN EPC - Bold, Innovative, Experienced

Main Office
2 Highwood Dr.
Suite 204
Tewksbury, MA 01876

New Jersey Office
28 Valley Rd.
Montclair, NJ 07042

PA Office
100 Front St.
Suite 900
West Conshohocken, PA 19428

cvm data security AICPA–SOC 2 Type 2 Compliant

cyber grx certification Tier 3 assessment for PSE&G

Eco Vadis Sustainability Silver Award Silver Award, Enbridge

ODIN's energy design and EPC projects provide home heating for millions, power to our neighboring businesses, and support carbon reduction for our society.
This is default text for notification bar